On a sunny day in late May, SCO HID Shipyard, in deep cooperation with the Argentine Water Treatment company, successfully delivered a large crane platform.
The crane platform is designed to allow Argentine customers to place heavy cranes in the Inner Sea basin for a 12-month construction period. After 60 busy working days, the exquisitely designed crane platform was placed on the container and officially embarked on the journey to the construction site in Argentina.
This picture was taken at the completion of SCO HID shipyard and is memorable.
Technical parameter:
Item | Specifications |
Total Length | 34.8m |
Pontoon Depth | 2.4m |
Breadth | 14.7m |
Shipping | 23 containers |
Lifting pile | Length: 19m, diameter: 530mm, screw connection |
Excavator walking motor | 4Sets |
Hydraulic cylinder lifting system | 6Sets |
Hydraulic system | 1Set |
Anchor | 4Sets |
Electric winch | 4Sets |
Engine | 50KW |
Generator set | 16KW |
Fuel tank | 20T |
Water tank | 10T |
Load | 650 |
Dead weight of platform | 335T |
This crane platform provides the Argentine customer with a safe and efficient offshore service work platform that enables workers to perform a variety of operations at altitude, improving work efficiency and safety.