The offshore engineering platform, as the carrying and working platform of the offshore excavator, is used to lay submarine pipelines on the seabed of the sea. The pipeline system is installed on the seabed for conveying liquids or gases.
Trench with a width of 3.0 meters and a depth of 2.2 meters will be dug in the seabed of offshore waters to lay pipelines transporting fresh water. The pipeline system can be used for a variety of purposes, including oil and gas exploitation, underwater communications, submarine cables, and Marine scientific research.
In this project, the application of the "self-lifting offshore engineering platform" allowed our Senegal customer to reliably complete the entire project work in a short period of time, and the completion time was a full five months ahead of schedule.
Technical parameter:
Overall Length:30m
Pontoon Width:24m
Pontoon Depth:3m
Pontoon weight:500tons
Support Capacity:300 tons
Deck Load Capacity:6 tons/m2 in pure deck area, 30 tons/m2 in pontoons connection area.
Pontoon Amount:12 Modular
Steel Plate Thickness:Bottom: 10mm/Side: 12mm/Deck:10mm Reinforced by L type steel inside
Modular 1 Size Quantity: 6/Size: 18m(L) x 4.0m(W) x 3.0m(H)
Modular 2 Size Quantity: 6/Size: 12m(L) x 4.0m(W) x 3.0m(H)
Hatch:Two on each modular for inspection.
Kevel:10 pairs
The offshore engineering platform, as the carrying and working platform of the offshore excavator, is used to lay submarine pipelines on the seabed of the sea. The pipeline system is installed on the seabed for conveying liquids or gases.
Trench with a width of 3.0 meters and a depth of 2.2 meters will be dug in the seabed of offshore waters to lay pipelines transporting fresh water. The pipeline system can be used for a variety of purposes, including oil and gas exploitation, underwater communications, submarine cables, and Marine scientific research.
In this project, the application of the "self-lifting offshore engineering platform" allowed our Senegal customer to reliably complete the entire project work in a short period of time, and the completion time was a full five months ahead of schedule.
Technical parameter:
Overall Length:30m
Pontoon Width:24m
Pontoon Depth:3m
Pontoon weight:500tons
Support Capacity:300 tons
Deck Load Capacity:6 tons/m2 in pure deck area, 30 tons/m2 in pontoons connection area.
Pontoon Amount:12 Modular
Steel Plate Thickness:Bottom: 10mm/Side: 12mm/Deck:10mm Reinforced by L type steel inside
Modular 1 Size Quantity: 6/Size: 18m(L) x 4.0m(W) x 3.0m(H)
Modular 2 Size Quantity: 6/Size: 12m(L) x 4.0m(W) x 3.0m(H)
Hatch:Two on each modular for inspection.
Kevel:10 pairs