In 2021,SCO HID has successfully provided 2sets of cutter suction dredgers for a prominent military port construction project in the United Arab Emirates (UAE). The combined equipment of 2 sets of Cutter Suction Dredger 7525 to extract sand and coral reefs from the offshore, clear the shipping channel, and discharge the sediment and coral reefs to designated areas through pipelines for naval dock construction project. The project will be completed in 5 years.
These dredgers are engineered with high-quality materials, ensuring durability and reliability in the demanding marine environment. Its sturdy design enables sustained operations even in adverse conditions, guaranteeing uninterrupted progress in the construction project.
Equipped with a powerful 700kw cutter head, the dredger can efficiently break down and dislodge sea hard soil and gravel. This cutting-edge technology minimizes operational time and maximizes productivity, enabling swift progress in the dredging activities.
HID's cutter suction dredger incorporates an efficient pumping system capable of handling the extracted materials. The dredger's integrated pipeline network efficiently transports the dredged soil and gravel to designated disposal areas, ensuring efficient and controlled sediment management
Equipped with advanced positioning and navigation systems, allowing for precise dredging operations. This ensures accurate excavation, minimizing the risk of damage to existing structures and optimizing the construction timeline.
This groundbreaking collaboration between HID and the UAE military aims to address the challenge of dredging sea-hard soil and gravel, ensuring the smooth and efficient construction of the port.